General Information
Facility Area
- 231㎡
Size and Production
- 350㎖ 4,800 Bottles/hour (1.8ℓ can also be produced)
Supply Stat Day
- September 3, 2007
Facility Type
- 1 line of automated bottle production
production Process
A facility to produced bottled water with the drrinking water to supply to the citizens
Automatic Opening
Bottle cleansing
Fill with tap water
Close and seal the bottle cap
Print the expiration date
Check the bottle for faults
Wrap the finished goods
Keep refrigerated(4˚C)
Release